CHS Refinery Wastewater Treatment Oil Removal System Upgrades

McPherson, Kansas, United States

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

The replacement of oil separation equipment with new technology enhanced performance and improved pre-treatment for the biological process at this refinery.

The API separator and dissolved air flotation (DAF) clarifier at the petroleum refinery had reached the end of their useful life and required replacement to enhance reliability. The design solution needed to be sufficiently robust to provide continuous operation at design conditions for a minimum five-year period. Due to the need to maintain the equipment in operation during construction and lack of available space for redundant treatment trains, the wastewater needed to be pumped to a new location for treatment.

Our approach

We provided detailed engineering and procurement services for the replacement and relocation of the API separator and dissolved air flotation (DAF) clarifier equipment.

Projected wastewater characteristics were developed to reflect future refinery upgrades and changes in crude oil sources. This led to existing equipment being replaced with two, 1,000 gpm treatment trains, including a new wastewater collection sump and gravity sewer, lift station, nitrogen-blanketed API separators, dissolved air flotation clarifiers capable of future retrofit to DNF, thermal oxidizer for treatment of off-gases, sludge and oil storage, and chemical feed facilities. 

This project included 3D structural and mechanical design, construction level documentation (one lines, loops, cable tray, conduit and cable schedule, elementaries, logic diagrams, instrument/IO index, P&IDs with client-specific software) and compliance with a very developed set of client specifications for implementation on a fast-track schedule. 

We also prepared equipment and materials procurement packages and managed procurement activities on behalf of the refinery. At construction stage, we provided submittal reviews, addressed contractor questions, and conducted site visits and equipment inspections during the manufacturing process.

As a separate project, we performed a Front-End Engineering Design (FEED) study for a reclaimed water system that could be installed in the future downstream of the new API-DAF and existing biological treatment system.  The reclaimed water system would be operated to produce boiler feed water and cooling tower make-up water.

Outcome

  • The 3D design and bills of materials allowed on-site contractors to fabricate mechanical systems in an expedited manner to meet the aggressive construction schedule.
  • Our involvement in the procurement of equipment and materials helped ensure necessary quality and delivery schedule.
  • The oil removal system has enhanced water efficiency at the refinery.